In extro you can record working time directly to projects. The recorded time is assigned to the selected project and job and used for reports and evaluations.
Record project time manually
Open Time tracking → Select “+” → Record project time
Enter project details
Save
-
Project time check
In the Project time tab, the recorded time is displayed
Record project time via presence time
Open Time tracking → Select “+” → Record presence time
- Assign a project in the entry dialog
Save
-
Presence time check
In the Project time tab, the recorded time is displayed