Work types are used in extro for time tracking on projects.
Only work types assigned to a project can be selected when tracking time.
In addition, the billable price is stored for each work type.
Procedure
- Open Settings → Company → Work types
-
Use “+” to add a new work type and enter the following details:
Title of the new work type
Priceto be billed externally
Key
The key must match the work code number in Xpandit .
(e.g. regular working hours according to the payroll or accounting system).Default in projects
Activate this so that the work type can be selected in projects .
- Save
Note
The stored price is billed externally.
Only activated work types are available for selection in time tracking .
A clearly defined key is required for accurate reports and billing.